Filters

Products

GTD-6/8RM

Supplier: United Engine Corporation (UEC)

The GТD-6RМ and GTD-8RМ are the two-shaft gas turbines, applied to drive the electric generators within low-to-medium capacity power plants (from 6 to 64 MW and above).

GTES-12

Supplier: United Engine Corporation (UEC)

The GTES-12 is the automated block-module complex of technological equipment, designed for power supply of communities, industrial facilities, housing and communal services, various facilities in distant regions, in emergency situations

GTD-4/6.3/10RM

Supplier: United Engine Corporation (UEC)

The GTD-4/6.3/10RM is a family of gas turbines, applied to drive the gas compressors within gas-pumping plants and the electric generators within power plants, rated at low-to-medium capacity (from 4 to 80 MW and above).

GTA-16GT and GTA-18GT* gas turbine generator set

Supplier: United Engine Corporation (UEC)

The sets are designed for electric power and heat supply to industrial and domestic consumers. AC electric power is generated with three-phase synchronous turbine generator driven by gas turbine drive PS-90EU-16 / PS- 90EU-16A (UEC Perm Engines, JSC) or by AL-31STE (UEC-UMPO, PJSC).

GTU-4PG Gas Turbine for Gas Transportation

Supplier: United Engine Corporation (UEC)

4 MW gas turbines are used in new generation GT gas compressor packages at underground gas storage stations and for mechanical drive of pumps, compressors, etc.

GTU-6PG Industrial Gas Turbine

Supplier: United Engine Corporation (UEC)

The updated GTU-6PG gas turbine with M-60 step-up gear was developed as a mechanical drive for centrifugal compressors used in gas turbine pumping packages. M-60 step-up gear makes it possible to optimize the parameters of a gas turbine pumping package. In 2006 the first gas turbine was installed at "Myldzhinskoe" gas-compressor field of "Tomskgazprom" OJSC. The gas turbine is currently in pilot operation in "Ural" GPA-6DKS gas pumping packaged unit. The gas turbine is also used as part of "Ural-6000"gas turbine pumping package, which was delivered to the Booster Station-2 within the Sakhalin-2 Project.

After-sales service

Supplier: United Engine Corporation (UEC)

PJSC "ODK-UMPO" provides a full range of services for after-sales service of the supplied aircraft engines

TV3-117

Supplier: United Engine Corporation (UEC)

Over 25 thousand TV3-117 engines have been manufactured since the start of production. Their total time in operation exceeds 16 million hours.

VK-2500

Supplier: United Engine Corporation (UEC)

Thanks to the improved performance of the VK-2500 engine the helicopter ceiling increases by 30%, the rate of climb by 50% and the payload, depending on the helicopter model, by 1,000 – 2,000 kg. The engine also improves the speed and maneuverability of the helicopter. Accordingly, the aircraft gain fundamentally new qualities for operation in the mountains as well as in areas with a hot climate.

TV7-117V

Supplier: United Engine Corporation (UEC)

The TV7-117V family provides better safety by making emergency power of 2800-3750 hp available in extreme situations. The engine features a new FADEC system based on the BARK-12 or BARK-57 electroniс engine control unit.