We offer services of preparation of design estimate documentation at each stage:
• Schematic Design
It is design and construction stage that is not subject of approval from state supervision bodies. Schematic design facilitates more detailed in-depth development of all facility parameters before making final decisions on all sections that include civil and structural design.
• Design Documentation
Design documentation is required for making principal architectural technical and process decisions, approval of documentation in supervisory bodies, expert evaluation and is prepared in accordance with state norms, rules and standards.
• Detail Design Documentation
comprises design documentation and package of documents for performance of civil construction and erection works. If required additional technical surveys can be also carried out.
Completed projects.
OTEK, JSC, subsidiary in city of Glazov, Udmurtia:
• Preparation of design (including design (including estimate) and working documentation packages) for reconstruction of control, alarm, warning, ESD system of chemically hazardous industrial facility, providing fulfillment of work tasks.
NZKhK, PJSC:
• Preparation of working documentation for NZKhK, PJSC facilities on 16 electric and process subjects within Customer investment program.
NPO Tsentrotekh:
• Preparation of working documentation for installation of gas atomization metal alloy production equipment in room 118 of building 70 of NPO Tsentrotekh, LLC within scope corresponding to scenario conditions.
Leningrad NPP:
• Preparation of design documentation on upgrading of Unit No. 3, 4 sealing system ejectors.
Resurs, LLC:
• Preparation of process documentation on switching of 2ТК 17-16, 2ТК 37-23 cubicles of Smolensk NPP to “dry” operation mode.
Complekt Energo, LLC:
• Preparation of working documentation for upgrading of Kalinin NPP Unit No. 1,2 К-1000-60/1500 turbine protection and automatic control system in part of installation of oil relief devices.
Bilibino NPP:
• Improvement of radiation protection by means of preparation of working documentation for setting up of automation system of radiation control of Bilibino NPP liquid effluents.
Kalinin NPP:
• Preparation of working documentation for upgrading of К-1000-60/3000 turbine lub oil system by means of implementation of Unit No. 3,4 fire resistant fluid water content monitoring automatic devices;
• Preparation of working documentation for implementation of Unit No. 1,2 site oil product content automatic control and automatic control of oil products in pressure pipeline of oil collector of contaminated industrial effluent pumping house.
Novovoronezh NPP:
• Preparation of working documentation for activity: «Local training simulator upgrade for preparation of 4th stage»;
• Preparation of working documentation on upgrading of NVNPP AMB 5 changing facilities to install LCM-300 overall sorting devices».
Kola NPP:
• Upgrade of steam generator safety valve control circuits due to replacement of pulse safety devices of steam generators. Units No. 1,2.
Beloyarskaya NPP:
• Preparation of design, working documentation on upgrading of Beloyarskaya NPP Unit No. 4 operating DC voltage system in part of implementation of emergency event recording system in accordance with technical assignment.
Natsionalnye Kanatnye Dorogi, LLC:
• Preparation of design documentation for facility "VTRK Arkhyz car parking"
• Schematic Design
It is design and construction stage that is not subject of approval from state supervision bodies. Schematic design facilitates more detailed in-depth development of all facility parameters before making final decisions on all sections that include civil and structural design.
• Design Documentation
Design documentation is required for making principal architectural technical and process decisions, approval of documentation in supervisory bodies, expert evaluation and is prepared in accordance with state norms, rules and standards.
• Detail Design Documentation
comprises design documentation and package of documents for performance of civil construction and erection works. If required additional technical surveys can be also carried out.
Completed projects.
OTEK, JSC, subsidiary in city of Glazov, Udmurtia:
• Preparation of design (including design (including estimate) and working documentation packages) for reconstruction of control, alarm, warning, ESD system of chemically hazardous industrial facility, providing fulfillment of work tasks.
NZKhK, PJSC:
• Preparation of working documentation for NZKhK, PJSC facilities on 16 electric and process subjects within Customer investment program.
NPO Tsentrotekh:
• Preparation of working documentation for installation of gas atomization metal alloy production equipment in room 118 of building 70 of NPO Tsentrotekh, LLC within scope corresponding to scenario conditions.
Leningrad NPP:
• Preparation of design documentation on upgrading of Unit No. 3, 4 sealing system ejectors.
Resurs, LLC:
• Preparation of process documentation on switching of 2ТК 17-16, 2ТК 37-23 cubicles of Smolensk NPP to “dry” operation mode.
Complekt Energo, LLC:
• Preparation of working documentation for upgrading of Kalinin NPP Unit No. 1,2 К-1000-60/1500 turbine protection and automatic control system in part of installation of oil relief devices.
Bilibino NPP:
• Improvement of radiation protection by means of preparation of working documentation for setting up of automation system of radiation control of Bilibino NPP liquid effluents.
Kalinin NPP:
• Preparation of working documentation for upgrading of К-1000-60/3000 turbine lub oil system by means of implementation of Unit No. 3,4 fire resistant fluid water content monitoring automatic devices;
• Preparation of working documentation for implementation of Unit No. 1,2 site oil product content automatic control and automatic control of oil products in pressure pipeline of oil collector of contaminated industrial effluent pumping house.
Novovoronezh NPP:
• Preparation of working documentation for activity: «Local training simulator upgrade for preparation of 4th stage»;
• Preparation of working documentation on upgrading of NVNPP AMB 5 changing facilities to install LCM-300 overall sorting devices».
Kola NPP:
• Upgrade of steam generator safety valve control circuits due to replacement of pulse safety devices of steam generators. Units No. 1,2.
Beloyarskaya NPP:
• Preparation of design, working documentation on upgrading of Beloyarskaya NPP Unit No. 4 operating DC voltage system in part of implementation of emergency event recording system in accordance with technical assignment.
Natsionalnye Kanatnye Dorogi, LLC:
• Preparation of design documentation for facility "VTRK Arkhyz car parking"