描述

Key competence:
• Floating gates consisting of mobile and fixed (gate frames) parts and used for closing and opening of water works holes of navigation passes;
• Navigation pass gates;
• Debris strainers and float booms for protection of HPP turbine loop against debris;
• Power hoisting equipment;
• Crane ways.

Completed Projects.

Zeyskaya HPP:
• Preparation of working documentation on replacement of MLP emergency-repair floating gates, hydraulic cylinders, assemblies and hydraulic control circuits;
• Preparation working documentation for replacement of existing floating gates with expired service life;
Boguchansk HPP:
• Works for support service of SERGI TP explosion and fire protection systems installed at Boguchansk HPP TTs-400000/220-NF1 unit transformers.
Cheboksary HPP:
• Performance of engineering surveys and preparation of working documentation sections to ensure reliability and process safety of Cheboksary HPP.