Key competence:
• Preparation of electric power industrial consumer power supply layouts;
• Designing of electric grid facilities including reconstruction and revamping of substations and max. 750 kV power transmission lines;
• Designing of operational dispatch control systems in electric grids, communication and remote control means;
• Designing of protection and automation relay systems in electric grids;
• Preparation and analysis of power distribution systems.

Completed Projects.

KEDR Greenhouse complex:
• Construction of 110 kV SS Borzaya and 110 kV ACL Barrikadnaya- Borzaya for Kedr Greenhouse facility.
NZKhK, PJSC:
• Replacement of DGR-1, DGR-2 bld.377 quenching reactors;
• Replacement of 10 kV SG CP-1 bld.118 for new switchgear;
• Replacement of 10 kV NSG CP-4 bld.642 for new switchgear;
• Replacement of oil circuit breakers of 10 kV ISG CP-3 bld.371 for vacuum one;
• Replacement of Т-1,2 SS-62 OST-1000/10/0,4 transformers for OST-1000/10/0,4;
• Replacement of oil circuit breakers of 10kV ISG CP-5 bld.48 for vacuum one;
• Laying of 10 kV cable line from ph.22 ESG-10 kV CP-4 bld.642 to SG-10 kV SS-77.