Modernization of the mobile power station EG-2500M
JSC "UEC-Perm Engines" has got large experience in conducting retrofit of mobile computer-aided gas turbine power packages EG-2500
Part number:
Supplier:
United Engine Corporation (UEC)Description
Description
The retrofit includes:
Dismantle of АI-20 engine, TGU-8, control board, oil system;
Adaptation of van for new equipment installation;
Installation: GTU-2,5П and transmission, units of GTU-2,5 control board, PKU-2500 genset control
panel, electric equipment of inner power supply, oil modules and oil air coolers;
Conducting of tests (72 hours).
Upgrading is made by means of JSC "UEC-Perm Engines" and is completed by delivery of modernized power packages to Customer. It is designated as EG-2500М.
The retrofit includes:
Dismantle of АI-20 engine, TGU-8, control board, oil system;
Adaptation of van for new equipment installation;
Installation: GTU-2,5П and transmission, units of GTU-2,5 control board, PKU-2500 genset control
panel, electric equipment of inner power supply, oil modules and oil air coolers;
Conducting of tests (72 hours).
Upgrading is made by means of JSC "UEC-Perm Engines" and is completed by delivery of modernized power packages to Customer. It is designated as EG-2500М.