Modernization of the PAES-2500M power plant
JSC "UEC-Perm Engines" has got large experience in conducting the retrofit of mobile computer-aided gas turbine power packages PAES-2500
Part number:
Supplier:
United Engine Corporation (UEC)Description
Description
The retrofit includes:
Dismantle of АI-20 engine, TGU-8, control board, oil system;
Adaptation of van for new equipment installation;
Installation: GTU-2,5P and transmission, units of GTU-2,5 control board, PKU-2500 genset control panel, electric equipment of inner power supply, oil modules and oil air coolers;
Conducting of tests (72 hours).
Upgrading is made by means of JSC "UEC-Perm Engines" and is completed by delivery of modernized packages to Customer. It is designated as PAES-2500М.
Information request
The retrofit includes:
Dismantle of АI-20 engine, TGU-8, control board, oil system;
Adaptation of van for new equipment installation;
Installation: GTU-2,5P and transmission, units of GTU-2,5 control board, PKU-2500 genset control panel, electric equipment of inner power supply, oil modules and oil air coolers;
Conducting of tests (72 hours).
Upgrading is made by means of JSC "UEC-Perm Engines" and is completed by delivery of modernized packages to Customer. It is designated as PAES-2500М.
Information request