Description

ADVANTAGES: minimum number of service shutdowns; minimum number of staff (2 people per shift); convenient repair and maintenance of power plant components included in a soundproof container, with ventilation systems, lighting and heating systems.
ACCOMMODATION
Indoors
Outside on a pre-prepared foundation.

FUEL:
natural / associated petroleum gas;
liquid fuel.

Installation:
directly at the construction place;
installation on the foundation within 8 hours;
when external communications are ready, commissioning can be carried out in two weeks.

TRANSPORTATION:
by separate blocks (modules), it doesn’t need any special lifting equipment by rail; by car; water transport
EXPLOITATION:
block-modular execution in full factory readiness;
assembled tests at the manufacturer;
ease of installation;
easy in usage.

CUSTOMERS: oil and gas producing, generating and industrial enterprises, including OJSC Gazprom and RAO UES of Russia, CJSC LUKOIL-Western Siberia, OJSC Surgutneftegas, Bashkirenergo, OJSC Ivanovo Generating Company, SEIC, etc.
BASIC PARAMETERS OF POWER PLANTS OF THE URAL SERIES
Station conditions, Рн = 760 mm Hg,
tn = + 15 ° С, nominal mode (Ne).
Fuel - natural gas according to OST 51-40, GOST 5542 (other types of fuel - as agreed with Aviadvigatel OJSC).

Specification

1. specification.docx