Gas turbines GTD-4RM, GTD-6.3RM, GTD-10RM
The GTD-4 / 6.3 / 10RM set of gas turbines was created as part of the long-term cooperation program between NPO Saturn and OAO Gazprom for the purpose of modernizing the gas transmission system of Russia.
Part number:
Supplier:
United Engine Corporation (UEC)Description
Design Features
9/10 stage high-pressure compressor (depending on version of the gas turbine engine);
annular combustion chamber;
2 stage high pressure turbine;
2/3 speed power turbine (depending on the type of gas turbine engine).
Application
GTD-4 / 6.3 / 10RM are the basis of gas pumping units GPA-4 / 6.3 / 10RM, which are used as part of compressor stations for gas transmission lines and underground gas storage of any total capacity (from 4 MW and above).
GTD-4 / 6.3 / 10RM can also be used as part of gas and turbine power plants of small and medium power (from 4 to 80 MW and above) to generate electric and thermal energy in simple, combined and cogeneration cycles in basic and semi-peak operation modes.
Benefits
high efficiency and fuel efficiency;
high reliability and operational safety.
9/10 stage high-pressure compressor (depending on version of the gas turbine engine);
annular combustion chamber;
2 stage high pressure turbine;
2/3 speed power turbine (depending on the type of gas turbine engine).
Application
GTD-4 / 6.3 / 10RM are the basis of gas pumping units GPA-4 / 6.3 / 10RM, which are used as part of compressor stations for gas transmission lines and underground gas storage of any total capacity (from 4 MW and above).
GTD-4 / 6.3 / 10RM can also be used as part of gas and turbine power plants of small and medium power (from 4 to 80 MW and above) to generate electric and thermal energy in simple, combined and cogeneration cycles in basic and semi-peak operation modes.
Benefits
high efficiency and fuel efficiency;
high reliability and operational safety.