High-speed system for ultrasonic inspections of rail conditions
The problems at most railway tracks related to high-speed traffic and the increasing number of train pairs that result in the higher track occupancy rate, as well as cost analysis show the feasibility of using mobile systems as primary diagnostic tools. Over recent years TVEMA has made a major technical breakthrough in terms of development and manufacture of various components for NDT equipment installed on mobile diagnostic systems. This breakthrough has dramatically increased inspection reliability compared to manual diagnostic devices which ultimately made mobile diagnostic systems a number one choice.
Part number:
Supplier:
JSC "Firma TVEMA"Description
In most foreign countries the development of diagnostics directly follows the path of upgrading NDT equipment components installed on mobile diagnostic systems. Manual diagnostic systems are essentially not used. TVEMA is actively engaged in refurbishment of third-party carriages. This is achieved through a flexible architecture of all equipment components developed by experienced engineers who created such various systems as:
• NDT inspection bogie;
• power supply equipment for the systems;
• pneumatic equipment;
• various types of tracking systems;
• skid probe systems;
• contact fluid supply system;
• ECHO-COMPLEX-2 multi-channel NDT analyzer;
• NDT inspection bogie;
• power supply equipment for the systems;
• pneumatic equipment;
• various types of tracking systems;
• skid probe systems;
• contact fluid supply system;
• ECHO-COMPLEX-2 multi-channel NDT analyzer;