Description

Operations performed:

- mobile moving from well to well;
- assembly and disassembly of control head with the main and auxiliary hoist;
- round trip with sucker rods, tubing and drill pipes;
- mechanized spinning-up and uncoupling of tubing and drill pipes;
- construction of cement bridging in holes through derrick manifold;
- drilling-out of sand plugs and cement bridging with the help of mechanical or hydraulic drive rotary;
- fishing and other works;
- flushing-out of wells through the derrick manifold;
- breakdown elimination;
- milling of the metallic parts of drilling equipment fallen into the well;
- well development after drilling completion.

Design features and advantages:

- drawworks is equipped with cable layer that provides uniform wire winding;
- a flange for connection of drawworks emergency drive is provided;
- chassis engine emergency stop from operator’s control or remote control console;
- extension of the derrick upper section is performed by hydraulic driven winch from the remote control console;
- hydraulic driven winch is used for auxiliary works;
- double action hydraulic jacks for leveling the rig;
- reverse reducer of transmission of rotary table is installed;
- drive for mechanical rotor is provided;
- drawworks chain drive is in the closed oil bath;
- Hydraulic system is dual-profiled:
1-profile is designed for carrying out auxiliary operations (rig hoisting, derrick lifting, derrick upper section moving-up, hydraulic control valve operation, auxiliary drawworks operation)
2-profile - hydraulic rotor operation, hydraulic wrench operation.

Base set

- KrAZ 65053 chassis;
- Drawworks with cable layer and emergency drive connection flange;
- Derrick;
- Hydraulic breaker;
- Manifold pipe raiser with gooseneck on derrick;
- Computer complex PTK IVE-50-MB;
- Operator console with shelter;
- IVE-50-20 weight indicator
- Calf line stock drum;
- Auxiliary drawworks.