Gas turbine thermal power plant GTES-2,5 is designated for electric and heat power generation and supply to industrial and domestic consumers. GTES-2,5 is also in-demand at oil and gas extraction facilities as major or stand-by source of electric power and heat. The design of the modular automated gas turbine unit GTES-2,5 was developed in collaboration with Power Plant Design Centre ROSEP, OJSC.
Part number:
ГТЭС-2,5
Supplier:
United Engine Corporation (UEC)Description
The gas turbine engine DO49R (UEC-Saturn, PJSC) rated at 2.5 MW is used as a drive.
High fuel utilization factor of the unit during cogeneration cycle ensures short payback period.
The thermal power plant is manufactured as transportable modules, fully pre-fabricated. GTES-2,5 scope of supply is subject to changes depending on the configuration and based on the result of the developments made for the technical definition improvement. Besides the standard scope of equipment, different optional equipment is available to meet Customer installation and operation requirements.
High fuel utilization factor of the unit during cogeneration cycle ensures short payback period.
The thermal power plant is manufactured as transportable modules, fully pre-fabricated. GTES-2,5 scope of supply is subject to changes depending on the configuration and based on the result of the developments made for the technical definition improvement. Besides the standard scope of equipment, different optional equipment is available to meet Customer installation and operation requirements.