Gas compressor set GPA-25
As a unit centrifugal compressor drive, gas turbine engines PS-90GP-3 are used (JSC UEC-Perm Engines).
Part number:
ГПА-25
Supplier:
United Engine Corporation (UEC)Description
This unit incorporates the most advanced and modern technologies of the gas turbine and compressor industry. The unit is intended for use as part of main gas pipelines compressor stations for gas transportation. The unit has high-performance technical and economic characteristics, which allows to maintain high technical capacity level during gas transportation.
PJSC Gazprom assigned GCU-25 for construction of compressor stations for the main gas pipelines Nord Stream, Bovanenkovo - Ukhta and Power of Siberia.
The unit fully meets its technical and operational requirements. It has an advanced remote control system with high level of security.
Unit type: hangar or modular containerized.
PJSC Gazprom assigned GCU-25 for construction of compressor stations for the main gas pipelines Nord Stream, Bovanenkovo - Ukhta and Power of Siberia.
The unit fully meets its technical and operational requirements. It has an advanced remote control system with high level of security.
Unit type: hangar or modular containerized.
Specification
1. GPA-25.pdf2. ГПА-25.pdf
3. Specification_IND.docx